Structured cabling using fiber optic backbone |
.E3 |
|
Objectives |
Requirements (PC) |
||||||||||
| In this experiment we want to show how
to carry out a cabling of a 2 floor building with fiber optic backbone. The first and last floor represented in the module TC74-MC are used. In the building star point a Switch is used. In the floor distributors N.2 HUB's are used. N.2 media converters are used to connect the 2 floors through fiber optics. |
|
|
Laboratory Equipments |
||||||||||||||||||
|
| Connection diagram |
![]() |
|
Connect the two computers according to the previously shown diagram and start, on both of them, the network communication program which is used for the experiment. |
Starting of the software
|
Description
software |
|
Operation check of the cabling with fiber optic backbone. |
Set the computer PC1 to operate as a server with:
|
||||||||||
Set the computer PC2 to operate as a PC1 client with:
|
When the button 'Connect' is pushed PC2 connects to the
server PC1. If the program doesn't show error messages the connection is right and the networks is operating |
|||||||||
| Send a file from the computer Client PC2 to the server PC1. | Check the right data transmission. | |||||||||
| Which type of fiber optics (62.5/125) is used in this exercise ? | ||||
| Monomodal fiber optics | Answer: |
|||
| Multimodal step-index fiber optics | ||||
| Multimodale graded-index fiber optics | ||||