Structured cabling using UTP backbone

.E2
  OBJECTIVES, REQUIREMENTS, EQUIPMENTS ObjectivesPredisposizioneExperimentQuestions

Objectives

  

Requirements (PC)

In this experiment we want to show how to carry out a cabling of a 2 floor building with connection backbone of the two UTP floors.
The first and last floor represented in the module TC74-MC are used.
In the building star point a Switch is used.
In the floor distributors N.2 HUB's are used.
   
  N.2 PC with network Card Ethernet 10/100Mb and connector for 10base-T
  TCP-IP protocol installed on both PC's
  (Installation of the TCP/IP protocol)

Laboratory Equipment

  Modulo DL TC74-MC
N.2 HUB Mod. TC74-DH 
N.1 SWITCH Mod. TC74-DS 
N.8 patch cables
 
  SYSTEM SETTING ObjectivesPredisposizioneExperimentQuestions
Connection diagram

Connect the two computers according to the previously shown diagram and start, on both of them, the network communication program which is used for the experiment.

  

Starting of the software
DLnetw

 

  

Description software
DLnetw

 
   EXPERIMENT

Operation check of the building cabling

ObjectivesPredisposizioneExperimentQuestions
Set the computer PC1 to operate as a server with:
LocalAddress = PC1
LocalPort = 1000
Push the Listen button.
   
Set the computer PC2 to operate as a PC1 client with:
RemoteAddress = PC1
RemotePort = 1000
Push the Connect button.
When the button 'Connect' is pushed PC2 connects to the server PC1.
If the program doesn't show error messages the connection is right and the networks is operating
   
Send a file from the computer Client PC2 to the server PC1. Check the right data transmission.
 
   QUESTIONS ObjectivesPredisposizioneExperimentQuestions
What do the two HUB's of this exercise represent, inside a structured cabling system ?
Campus star point CD/MC
 
Answer:
Building star point BD/IC
Star point or Floor distributor (FD/HC)